Until Spring
2001, DeKalb County's raw water storage from the
Chattahoochee River consisted of two reservoirs.
The capacity of those two reservoirs was 240 million
gallons. In May 2001 construction began to increase
the storage at the two existing reservoirs and add
a third reservoir for a total capacity of one billion
gallons. The cost of the project, which was completed
in 2004, was $44 million.
Storage in the two existing reservoirs will be increased
by raising the elevation of the dams approximately
10 feet and excavating the bottoms of the lakes
an equivalent amount. The new third reservoir will
be fed by a new pipe from the existing lakes.
Peeler Road Linear Park was established along the
perimeter of the property along Peeler Road.